Retail/Entertainment

Dacor Showroom

Pinstripes - Topanga
General Contractor:
Driver SPG.
Architect:
John Sergio Fisher & Associates
Location:
2500 North Main Street
Santa Ana, CA 92705
Scope:
Design completion of 30% bridge documents for Expansion Building and BESS System.
3-story Expansion to Existing Building.
Build complete electrical system including Edison Battery Back-up System (BESS).
Size:
43,340 sq ft.

Covina Bowl
General Contractor:
ITX Construction/Consultant’s
Architect:
Aria Group Architects, Inc.
Location:
6801 Hollywood Blvd. Suite 363
Hollywood, CA 90028
Scope:
Tenant improvement restaurant and entertainment complex
on 3rd floor of the mixed use Hollywood & Highland Center
Size:
45,029 sq ft.
General Contractor:
AnCor Inc.
Architect:
NCA Partners
Location:
1555 Simi Town Center Way
Simi Valley, CA 93065
Scope:
Complete electrical system for new building.

Wolf Sub-Zero Cove Costa Mesa Showroom
General Contractor:
Roel Construction Company, Inc.
Architect:
Architects Orange
Location:
57 Fortune Dr
Irvine, CA 92618
Scope:
Build electrical system for two new buildings, including
site work to upgrade power to accommodate addition of new buildings, relocating
and reconnecting of all existing site power and lighting, and Fire Life Safety System.
© 2025 Access Electric Inc. All rights reserved.
