Miscellaneous

{{brizy_dc_image_alt imageSrc=

Descanso Gardens - Farmhouse

{{brizy_dc_image_alt imageSrc=

Boardwalk Cafe - Irvine

{{brizy_dc_image_alt imageSrc=

Skid Row - Simone

General Contractor:

Snyder Langston Residential, LLC

Architect:

Koning Eizenberg Architecture

Location:

520 S. San Julian St.

Los Angeles, CA 90013

Scope:

Substantial renovation of 227 units. The scope of work included

upgrading all areas per Title 24 requirements including all new lighting system

with low voltage controls, new power for HVAC for all units, and new inverters

for back-up power. The Simone included new upgraded main service including new

meter sections, with transformers, distribution centers, and subpanels. 

Additional work included new electrical for modernized existing elevator in two buildings and

new elevator in one, new electrical rooms, new transformers and other electrical equipment, upgrades to

existing common kitchen areas and bathrooms, and new photovoltaic systems.

{{brizy_dc_image_alt imageSrc=

Skid Row - Rossmore Housing

General Contractor:

Snyder Langston Residential, LLC

Architect:

Brooks + Scarpa Architects, Inc.

Location:

905 East 6th St.

Los Angeles, CA 90013

Scope:

The substantial renovation of 58 units of permanent

supportive housing single room occupancy units was completed on a very tight

schedule. Located in Downtown Los Angeles in a highly congested urban site, the

work was completed while the building was occupied, requiring the building systems

to be kept alive for resident use during construction.  The scope of work included upgrading all

areas per Title 24 requirements including all new lighting system with low

voltage controls, new power for HVAC for all units, and new inverters for back-up power.

{{brizy_dc_image_alt imageSrc=

Good Shepherd Center

General Contractor:

Snyder Langston

Architect:

Onyx Architects Inc.

Location:

1671 Beverly Blvd.

Los Angeles, CA 90026

Scope:

Built electrical system for new construction of transitional housing and educational facility

including dimmer system, commercial/residential multiple meter power, site lighting,

underground parking structure lighting and controls, methane system, fire life safety system,

voice and data systems, security system, CCTV system, TV system, and access control system.

Size:

37,548 sq ft.

{{brizy_dc_image_alt imageSrc=

Cerritos Plaza

General Contractor:

Snyder Langston

Architect:

Architects Orange

Location:

11111-11263 183rd St.

Cerritos, CA 90703

Scope:

Complete electrical system for multiple core and shell buildings in

multi-acre retail development. Upgraded main utility underground conduit systems

and LED parking lot lighting. Provided new landscape lighting and power.

{{brizy_dc_image_alt imageSrc=

Senator Hotel - Los Angeles

General Contractor:

Snyder Langston Residential, LLC

Architect:

Killefer Flammang Architects

Location:

729 S. Main Street

Los Angeles, CA 90014

Scope:

Complete electrical for upgraded MEP systems, bathrooms,

and common areas in existing 4-story, Type III building.

97 Public housing units and one Manager Apartment.

Size:

30,304 sq ft.

{{brizy_dc_image_alt imageSrc=

Simi Valley Town Center

General Contractor:

The Whiting-Turner Contracting Company

Architect:

Architects Orange

Location:

Simi Town Center Way

Simi Valley, CA 93065

Scope:

Electrical for wayfinding and pylon signs in operating shopping mall.

© 2025 Access Electric Inc. All rights reserved.

{{brizy_dc_image_alt imageSrc=