Commercial Buildings

{{brizy_dc_image_alt imageSrc=

Studio Plaza - Burbank

General Contractor:

Matt Construction Corporation

Architect:

Gensler

Location:

3400 W Riverside Dr

Burbank, CA 91505

Scope:

Complete electrical system for renovated existing exterior plaza,

landscape and lighting on ground floor and level 2 terrace at existing type 1a high rise building.

Interior lobby and restroom improvements.

Size:

51,243 sq ft.

{{brizy_dc_image_alt imageSrc=

Masimo Lab & EMC Chamber - Irvine

General Contractor:

Snyder Langston

Architect:

HPA, Inc.

Location:

52 Discovery

Irvine, CA 92618

Scope:

Complete electrical system for new laboratory and electromagnetic compatibility chamber.

Size:

6,680 sq ft.

{{brizy_dc_image_alt imageSrc=

West End

General Contractor:

Del Amo Construction, Inc.

Architect:

HLW International LLP

Location:

10730 West Pico Blvd

  Los Angeles, CA 90064

Scope:

Complete electrical system for core and shell of 3 story office building.

Includes two new 4000A 480/277V, main services, distribution equipment, panels,

HVAC equipment, Title 24 compliance forms, temporary and permanent lighting and lighting controls.

Size:

204,032 sq ft.

{{brizy_dc_image_alt imageSrc=

NantStudios - El Segundo

{{brizy_dc_image_alt imageSrc=

NantWorks - Culver City

General Contractor:

Del Amo Construction, Inc.

Architect:

Gruen Associates

Location:

9919 Jefferson Blvd

Culver City, CA 90232

Scope:

Complete electrical system for 3-floor office with roof system.

Size:

19,452 sq ft.

{{brizy_dc_image_alt imageSrc=

9720 Wilshire

{{brizy_dc_image_alt imageSrc=

Relativity Space - HQ

General Contractor:

W.E. O'Neil Construction

Architect:

Access Electric Inc.

Location:

2400 E Wardlow Road

Long Beach, CA 90807

Scope:

Complete electrical Design and build for the new chiller plant to service the factory.

New 4000A service to accommodate the new chillers, and re-work of the air handling units in the south factory.

Installation of FA backbone across the whole factory. Various smaller hi bay lighting and modular building improvements. Various landscape lighting improvements

{{brizy_dc_image_alt imageSrc=

Intersect - Irvine

General Contractor:

Snyder Langston

Architect:

IA Interior Architects

Location:

17875 & 17877 Von Karman

17872 Gillette

Irvine, CA 92614

Scope:

Complete electrical for 3-building remodel.  Included renovations at the Entry

Portal Areas, Restrooms, Lobbies, and Levels 1 and 2 of the Basement in

Buildings A and B. Also included in the renovation were a Conference Center,

Fitness Center, Training Room, Locker Rooms, Spin/TRX Rooms, and Kitchen Area.

{{brizy_dc_image_alt imageSrc=

NantWorks - Garage

General Contractor:

Del Amo Construction, Inc.

Architect:

Gruen Associates

Location:

9919 Jefferson Blvd

Culver City, CA 90232

Scope:

Complete electrical system for 4-level open

parking structure with one level below grade enclosed.

Size:

124,031 sq ft.

{{brizy_dc_image_alt imageSrc=

Scholle Center Building - Irvine

General Contractor:

Del Amo Construction, Inc.

Architect:

LRS Architects, Inc.

Location:

19520 Jamboree Rd.

Irvine, CA 92612

Scope:

Design build electrical system with back up generator for core and shell of

new five story office building with a subterranean garage. Site work including Parking Lot Lighting,

Landscape Lighting, and Dry Utilities. Design Build Fire Alarm System.

Size:

130,000 sq ft.

{{brizy_dc_image_alt imageSrc=

Rivian - Carson Office

General Contractor:

Driver SPG

Architect:

IA Interior Architects

Location:

1059 E Bedmar St

Carson, CA 90746

Scope:

Design-build complete electrical system for single story

with mezzanine existing building renovation for laboratory use purposes. New

Distribution and Panelboard; 4.8 KVA Emergency Lighting Inverter; Complete new

lighting and lighting control system; DC Fast Chargers

© 2025 Access Electric Inc. All rights reserved.

{{brizy_dc_image_alt imageSrc=