Design & Build

{{brizy_dc_image_alt imageSrc=

Junipero Serra High School Sports Complex

General Contractor:

Bluefin Construction, Inc.

Architect:

Jacobs Engineering

Location:

26351 Junipero Serra Rd

San Juan Capistrano, CA

Scope:

Design build 60,000 square foot gymnasium and 29 acre sports facilities including

baseball fields, softball fields, soccer field, football field, track field, tennis courts, volleyball courts,

outdoor basketball courts, and Olympic size swimming pool. Landscape lighting and parking lot lighting.

Pedestrian bridges interconnecting South Campus with North Campus.

{{brizy_dc_image_alt imageSrc=

Scholle Center Building - Irvine

General Contractor:

Roel Construction Company, Inc.

Architect:

LRS Architects, Inc.

Location:

19520 Jamboree Rd.

Irvine, CA 92612

Scope:

Design build electrical system with back up generator for core and shell of

new five story office building with a subterranean garage. Site work including Parking Lot Lighting,

Landscape Lighting, and Dry Utilities. Design Build Fire Alarm System.

Size:

130,000 sq ft.

{{brizy_dc_image_alt imageSrc=

Discovery Science Center

General Contractor:

Driver SPG.

Architect:

John Sergio Fisher & Associates

Location:

2500 North Main Street

Santa Ana, CA 92705

Scope:

Design completion of 30% bridge documents for Expansion Building and BESS System.

3-story Expansion to Existing Building.

Build complete electrical system including Edison Battery Back-up System (BESS).

Size:

43,340 sq ft.

{{brizy_dc_image_alt imageSrc=

Eastside Church - Anaheim

Owner:

Eastside Christian Church

Architect:

J7 Architecture

Location:

3370 Mira Loma Ave

Anaheim, CA 92806

Scope:

Design-build renovation of youth center with new

electrical service and new lighting, including Elation Theatre Lighting and Controls.

{{brizy_dc_image_alt imageSrc=

Relativity Space - HQ

General Contractor:

W.E. O'Neil Construction

Architect:

Access Electric Inc.

Location:

2400 E Wardlow Road

Long Beach, CA 90807

Scope:

Complete electrical design and build for the new chiller plant to service the factory.

New 4000A service to accommodate the new chillers, and re-work of the air handling units in the south factory.

Installation of FA backbone across the whole factory. Various smaller hi bay lighting and modular building improvements. Various landscape lighting improvements

{{brizy_dc_image_alt imageSrc=

Rivian - Carson Office

General Contractor:

Driver SPG

Architect:

IA Interior Architects

Location:

1059 E Bedmar St

Carson, CA 90746

Scope:

Design-build complete electrical system for single story

with mezzanine existing building renovation for laboratory use purposes. New

Distribution and Panelboard; 4.8 KVA Emergency Lighting Inverter; Complete new

lighting and lighting control system; DC Fast Chargers

{{brizy_dc_image_alt imageSrc=

Caltech - Moore Walk

General Contractor:

Del Amo Construction, Inc.

Architect:

Spurlock Landscape Architects

Location:

308 S Michigan Ave

Pasadena, CA

Scope:

Design and build complete electrical system for the CIT Moore walkway,

adhering to landscape architect's drawings.

© 2025 Access Electric Inc. All rights reserved.

{{brizy_dc_image_alt imageSrc=