K-12 Schools

{{brizy_dc_image_alt imageSrc=

Flintridge Preparatory School

General Contractor:

Driver SPG

Architect:

Harley Ellis Devereaux

Location:

4543 Crown Ave

La Canada Flintridge, CA 91011

Scope:

Complete electrical system for new ground up building and classrooms.

{{brizy_dc_image_alt imageSrc=

Webb Schools - Nelson Performing Arts Center

General Contractor:

Del Amo Construction, Inc.

Architect:

Page & Turnbull

Location:

1175 W. Baseline Rd

Claremont, CA 91711

Scope:

Complete renovation of performing arts center with power upgrades,

new Lighting and Dimming Control System, ETC Theatre Lighting System and Controls.

Size:

6,392 sq ft.

{{brizy_dc_image_alt imageSrc=

St. Margaret's Performing Arts Center

General Contractor:

Del Amo Construction, Inc.

Architect:

Bastien & Associates, Inc.

Location:

31511 La Novia Avenue

San Juan Capistrano, CA 92675

Scope:

Complete electrical for new performing arts center including

Lighting and Dimming Control System, ETC Theatre Lighting System and Controls,

Site lighting and power. Campus occupied for duration of construction project.

Size:

44,333 sq ft.

{{brizy_dc_image_alt imageSrc=

Milken High School

General Contractor:

Del Amo Construction, Inc.

Architect:

Lehrer Architects

Location:

15900 W. Mulholland Dr

Los Angeles, CA 90049

Scope:

Complete electrical system for tenant improvements of two upper level classrooms.

{{brizy_dc_image_alt imageSrc=

Sage Hill High School

General Contractor:

C.W. Driver

Architect:

Steinberg Architects

Location:

20402 Newport Coast Drive

Newport Coast, CA 92657

Scope:

New complete electrical system for Science Center consisting

of labs and classrooms, Electrical and Data Rooms, Site work, and parking lot

improvements. Fire Life Safety System and Data Communications System.

Size:

12,955 sq ft.

{{brizy_dc_image_alt imageSrc=

Scholarship Preparatory

{{brizy_dc_image_alt imageSrc=

KIPP Elementary Charter School

General Contractor:

Del Amo Construction, Inc.

Architect:

Franco Architects, Inc.

Location:

4410 S. Budlong Ave

Los Angeles, CA 90037

Scope:

Complete electrical system for building with change of use

from Church/Sunday School to Elementary School (Grades TK-4). Existing church

structure repurposed with a second floor added to the building. Adjacent

2-story with full basement classroom building was demolished. Constructed new

classroom building with underground parking adjacent to existing church

structure. Basement contains 24 parking spaces. The 2 structures contain 24

classrooms, student and staff restrooms, administrative offices, 1 multipurpose

room and required site work.

Size:

30,000 sq ft.

{{brizy_dc_image_alt imageSrc=

Villa Esperanza Services - Pasadena

{{brizy_dc_image_alt imageSrc=

Crean Lutheran High School - Band Building

{{brizy_dc_image_alt imageSrc=

Junipero Serra High School

General Contractor:

Bluefin Construction, Inc.

Architect:

Jacobs Engineering

Location:

26351 Junipero Serra Rd

San Juan Capistrano, CA

Scope:

Tenant improvement lighting for classrooms.

© 2025 Access Electric Inc. All rights reserved.

{{brizy_dc_image_alt imageSrc=