Sports Facilities

{{brizy_dc_image_alt imageSrc=

Occidental College Athletic Complex

General Contractor:

Del Amo Construction, Inc.

Architect:

Moule & Polyzoides Architects and Urbanist

Location:

1600 Campus Rd

Los Angeles, CA 90041

Scope:

Complete electrical system for Demandel pool complex & McKinnon Center.

{{brizy_dc_image_alt imageSrc=

Vanguard University Event Center & Gym

General Contractor:

Mille and Severson, Inc.

Architect:

Gensler

Location:

55 Fair drive

Costa Mesa, CA 92626

Scope:

Complete electrical system for 3-story ground up multi-sport gymnasium

with 3 levels of laboratory classrooms on both sides of the gymnasium building.

1000A/3P 277/480V Distribution Board & 1000A/3P 120/208V Distribution

Board; 12.5 KVA Emergency Lighting Inverter; Full new site and building lighting & lighting control.

{{brizy_dc_image_alt imageSrc=

Junipero Serra High School Sports Complex

General Contractor:

Bluefin Construction, Inc.

Architect:

Jacobs Engineering

Location:

26351 Junipero Serra Rd

San Juan Capistrano, CA

Scope:

Design build 60,000 square foot gymnasium and 29 acre sports facilities including

baseball fields, softball fields, soccer field, football field, track field, tennis courts, volleyball courts,

outdoor basketball courts, and Olympic size swimming pool. Landscape lighting and parking lot lighting.

Pedestrian bridges interconnecting South Campus with North Campus.


{{brizy_dc_image_alt imageSrc=

24 Hour Fitness

{{brizy_dc_image_alt imageSrc=

Iconix - Hollywood Park

{{brizy_dc_image_alt imageSrc=

LA Fitness

{{brizy_dc_image_alt imageSrc=

Pepperdine University - Fitness Center

© 2025 Access Electric Inc. All rights reserved.

{{brizy_dc_image_alt imageSrc=