Miscellaneous

Descanso Gardens - Farmhouse

Boardwalk Cafe - Irvine
General Contractor:
Snyder Langston Residential, LLC
Architect:
Koning Eizenberg Architecture
Location:
520 S. San Julian St.
Los Angeles, CA 90013
Scope:
Substantial renovation of 227 units. The scope of work included
upgrading all areas per Title 24 requirements including all new lighting system
with low voltage controls, new power for HVAC for all units, and new inverters
for back-up power. The Simone included new upgraded main service including new
meter sections, with transformers, distribution centers, and subpanels.
Additional work included new electrical for modernized existing elevator in two buildings and
new elevator in one, new electrical rooms, new transformers and other electrical equipment, upgrades to
existing common kitchen areas and bathrooms, and new photovoltaic systems.
General Contractor:
Snyder Langston Residential, LLC
Architect:
Brooks + Scarpa Architects, Inc.
Location:
905 East 6th St.
Los Angeles, CA 90013
Scope:
The substantial renovation of 58 units of permanent
supportive housing single room occupancy units was completed on a very tight
schedule. Located in Downtown Los Angeles in a highly congested urban site, the
work was completed while the building was occupied, requiring the building systems
to be kept alive for resident use during construction. The scope of work included upgrading all
areas per Title 24 requirements including all new lighting system with low
voltage controls, new power for HVAC for all units, and new inverters for back-up power.
General Contractor:
Snyder Langston
Architect:
Onyx Architects Inc.
Location:
1671 Beverly Blvd.
Los Angeles, CA 90026
Scope:
Built electrical system for new construction of transitional housing and educational facility
including dimmer system, commercial/residential multiple meter power, site lighting,
underground parking structure lighting and controls, methane system, fire life safety system,
voice and data systems, security system, CCTV system, TV system, and access control system.
Size:
37,548 sq ft.
General Contractor:
Snyder Langston
Architect:
Architects Orange
Location:
11111-11263 183rd St.
Cerritos, CA 90703
Scope:
Complete electrical system for multiple core and shell buildings in
multi-acre retail development. Upgraded main utility underground conduit systems
and LED parking lot lighting. Provided new landscape lighting and power.
General Contractor:
Snyder Langston Residential, LLC
Architect:
Killefer Flammang Architects
Location:
729 S. Main Street
Los Angeles, CA 90014
Scope:
Complete electrical for upgraded MEP systems, bathrooms,
and common areas in existing 4-story, Type III building.
97 Public housing units and one Manager Apartment.
Size:
30,304 sq ft.
General Contractor:
The Whiting-Turner Contracting Company
Architect:
Architects Orange
Location:
Simi Town Center Way
Simi Valley, CA 93065
Scope:
Electrical for wayfinding and pylon signs in operating shopping mall.
© 2025 Access Electric Inc. All rights reserved.
