Higher Education
General Contractor:
Del Amo Construction, Inc.
Architect:
Ehrlich Yanai Rhee Chaney Architects
Location:
541 N Lemon Street
Orange, CA 92866
Scope:
Complete electrical system for single story Killefer Historic Building Renovation and
two-story ground up Lab Building, both for university laboratory use.
New 1200A SCE Service switchboard with new conduits and vaults for new SCE transformer;
New 230KW outdoor emergency generator; Full new site and buildings, lighting and lighting control.
General Contractor:
Del Amo Construction, Inc.
Architect:
Space Lab Plus
Location:
1200 East California Blvd
Pasadena, CA 91125
Scope:
Complete electrical system for CIT Linde Labs
Size:
2,211 sq ft.
General Contractor:
Del Amo Construction, Inc.
Architect:
Spurlock Landscape Architects
Location:
308 S Michigan Ave
Pasadena, CA
Scope:
Design and build complete electrical system for the CIT Moore walkway,
adhering to landscape architect's drawings.
General Contractor:
Del Amo Construction, Inc.
Architect:
ZGF Architects, Space Lab Plus
Location:
1200 E California Blvd
Pasadena, CA 91125
Scope:
Complete electrical for new medical and mathematics/physics lab spaces for professors on university campus,
including new power distribution, lighting, and equipment hookups.
General Contractor:
Del Amo Construction, Inc.
Architect:
Darin Johnstone Architects
Location:
950 South Raymound Ave,
Pasadena, CA 91105
Scope:
Complete electrical system for re-working of an old Wind Tunnel space. Built a new
two-story automotive design space within the existing wind tunnel.
General Contractor:
Del Amo Construction, Inc.
Architect:
Land Office
Location:
908 S. Raymond Ave
Pasadena, CA 91105
Scope:
Complete electrical system for new ground up
shop building and classrooms.
Size:
Multiple buildings - up to 67,000 sq ft.

ArtCenter College of Design - Hyundai & Kia Innovation Lab
General Contractor:
W.E. O’Neil Construction
Architect:
HDR Architecture, Inc.
Location:
900 University Ave
Riverside, CA 92507
Scope:
Upgrade existing infrastructure, provide new efficient and code compliant electrical
system for 4-story research laboratory building.
Size:
114,848 sq ft.
General Contractor:
Del Amo Construction, Inc.
Architect:
Moule & Polyzoides Architects and Urbanist
Location:
1600 Campus Rd
Los Angeles, CA 90041
Scope:
Complete electrical system for Demandel pool complex & McKinnon Center.
General Contractor:
Mille and Severson, Inc.
Architect:
Gensler
Location:
55 Fair drive
Costa Mesa, CA 92626
Scope:
Complete electrical system for 3-story ground up multi-sport gymnasium
with 3 levels of laboratory classrooms on both sides of the gymnasium building.
1000A/3P 277/480V Distribution Board & 1000A/3P 120/208V Distribution
Board; 12.5 KVA Emergency Lighting Inverter; Full new site and building lighting & lighting control.

Pepperdine University - Fitness Center