Retail/Entertainment

Dacor Showroom

Pinstripes - Topanga

Discovery Science Center

General Contractor:

Driver SPG.

Architect:

John Sergio Fisher & Associates

Location:

2500 North Main Street

Santa Ana, CA 92705

Scope:

Design completion of 30% bridge documents for Expansion Building and BESS System.

3-story Expansion to Existing Building.

Build complete electrical system including Edison Battery Back-up System (BESS).

Size:

43,340 sq ft.

Covina Bowl

Dave & Buster's - Hollywood

General Contractor:

ITX Construction/Consultant’s

Architect:

Aria Group Architects, Inc.

Location:

6801 Hollywood Blvd. Suite 363

Hollywood, CA 90028

Scope:

Tenant improvement restaurant and entertainment complex

on 3rd floor of the mixed use Hollywood & Highland Center

Size:

45,029 sq ft.

Studio Movie Grill

General Contractor:

AnCor Inc.

Architect:

NCA Partners

Location:

1555 Simi Town Center Way

Simi Valley, CA 93065

Scope:

Complete electrical system for new building.

Wolf Sub-Zero Cove Costa Mesa Showroom

Irvine Spectrum Center

General Contractor:

Roel Construction Company, Inc.

Architect:

Architects Orange

Location:

57 Fortune Dr

Irvine, CA 92618

Scope:

Build electrical system for two new buildings, including

site work to upgrade power to accommodate addition of new buildings, relocating

and reconnecting of all existing site power and lighting, and Fire Life Safety System. 

© 2025 Access Electric Inc. All rights reserved.