K-12 Schools

Flintridge Preparatory School

General Contractor:

Driver SPG

Architect:

Harley Ellis Devereaux

Location:

4543 Crown Ave

La Canada Flintridge, CA 91011

Scope:

Complete electrical system for new ground up building and classrooms.

Webb Schools - Nelson Performing Arts Center

General Contractor:

Del Amo Construction, Inc.

Architect:

Page & Turnbull

Location:

1175 W. Baseline Rd

Claremont, CA 91711

Scope:

Complete renovation of performing arts center with power upgrades,

new Lighting and Dimming Control System, ETC Theatre Lighting System and Controls.

Size:

6,392 sq ft.

St. Margaret's Performing Arts Center

General Contractor:

Del Amo Construction, Inc.

Architect:

Bastien & Associates, Inc.

Location:

31511 La Novia Avenue

San Juan Capistrano, CA 92675

Scope:

Complete electrical for new performing arts center including

Lighting and Dimming Control System, ETC Theatre Lighting System and Controls,

Site lighting and power. Campus occupied for duration of construction project.

Size:

44,333 sq ft.

Milken High School

General Contractor:

Del Amo Construction, Inc.

Architect:

Lehrer Architects

Location:

15900 W. Mulholland Dr

Los Angeles, CA 90049

Scope:

Complete electrical system for tenant improvements of two upper level classrooms.

Sage Hill High School

General Contractor:

C.W. Driver

Architect:

Steinberg Architects

Location:

20402 Newport Coast Drive

Newport Coast, CA 92657

Scope:

New complete electrical system for Science Center consisting

of labs and classrooms, Electrical and Data Rooms, Site work, and parking lot

improvements. Fire Life Safety System and Data Communications System.

Size:

12,955 sq ft.

Scholarship Preparatory

KIPP Elementary Charter School

General Contractor:

Del Amo Construction, Inc.

Architect:

Franco Architects, Inc.

Location:

4410 S. Budlong Ave

Los Angeles, CA 90037

Scope:

Complete electrical system for building with change of use

from Church/Sunday School to Elementary School (Grades TK-4). Existing church

structure repurposed with a second floor added to the building. Adjacent

2-story with full basement classroom building was demolished. Constructed new

classroom building with underground parking adjacent to existing church

structure. Basement contains 24 parking spaces. The 2 structures contain 24

classrooms, student and staff restrooms, administrative offices, 1 multipurpose

room and required site work.

Size:

30,000 sq ft.

Villa Esperanza Services - Pasadena

Crean Lutheran High School - Band Building

Junipero Serra High School

General Contractor:

Bluefin Construction, Inc.

Architect:

Jacobs Engineering

Location:

26351 Junipero Serra Rd

San Juan Capistrano, CA

Scope:

Tenant improvement lighting for classrooms.

© 2025 Access Electric Inc. All rights reserved.